HOME
  • Practice
  • People
  • Projects
  • Culture
  • Terroir_maitlandbowls_stage2_100432_thumb_bw Terroir_maitlandbowls_stage2_100432_thumb
    Maitland in Steel Profile

    TERROIR's Maitland City Bowls project has been featured...

  • Mw_steel_thumb_bw Mw_steel_thumb
    Makers' Steel Award

    Makers' Workshop has been awarded for the design of its...

  • Img_5142_thumb_bw Img_5142_thumb
    Clareville House

    The project is currently under construction. 

  • Brw_article_100729_page_1_thumb_bw Brw_article_100729_page_1_thumb
    BRW Interview

    Gerard Reinmuth has been interviewed for BRW (Business...

  • Villawood_thumb_bw Villawood_thumb
    Contextual Surface at UTS

    Gerard Reinmuth and Tamara Donnellan are running a Masters...

  • 00_thumb_bw 00_thumb
    Winery, Great Wall

    TERROIR were invited to design a Winery on a prominent...

  • 00_thumb_bw 00_thumb
    Pavilion, Great Wall

    TERROIR were invited to design a centre-piece Pavilion...

  • Terroir_maitlandbowls_stage2_000013_thumb_bw Terroir_maitlandbowls_stage2_000013_thumb
    Maitland City Bowling Club Stage 2

    Maitland City Bowls Stage 2 sees the continued implementation...

  • Outside_02_bw_thumb_bw Outside_02_bw_thumb
    Tasman District School

    Under construction.  The new prep classroom at Tasman...

  • Metropolis_thumb_bw Metropolis_thumb
    Metropolis Laboratory 2010

    Gerard Reinmuth will be a keynote lecturer at the 2010...

  • 05_thumb_bw 05_thumb
    4 Contexts

    Gerard Reinmuth is running a workshop with students at...

  • Terroir_burniemakersworkshop_000145_thumb_bw Terroir_burniemakersworkshop_000145_thumb
    Makers Workshop awarded

    Makers Workshop has received the major public building...


< PREVIOUS NEXT >